We're at the end of week 10 of construction (or we were when I took these pictures...I'm trying to catch up on everything.) The end of week 10 wasn't too busy but we did get the tile installed in both of the full bathrooms. We upgraded the master bathroom a little bit with a different floor and some accent tiles in the shower. Our second bathroom has a really pretty almond color tile on the floor and in the shower. The downstairs bathroom will have hardwood so no tile in there.
They hadn't finished the grout yet when I took these pictures so it looks even better now. The greatest part about the master bathroom is that we have two shower heads. No more one side of you being cold while you're taking a shower. We can't wait!